Thane: Central Railway will operate a 14-hour infrastructure block on a fast track that exists between Thane and Diva to cut and connective slow lines that are overeating with existing rapid corridors and crossover commissioning in connection with the corridor expansion project on stretching.
The block will be operated on the fast line down from 1:20 a.m.
on January 23 to 3.20 in the afternoon and for two hours in the fast row starting at 12:30 a.m.
until 2:30 p.m.
TNN.