The station in Gurugram & Rewari in the proposed Delhi-Ahmedabad train corridor – News2IN
Gurgaon

The station in Gurugram & Rewari in the proposed Delhi-Ahmedabad train corridor

The station in Gurugram & Rewari in the proposed Delhi-Ahmedabad train corridor
Written by news2in

Gurugram: A station has been proposed in Manesar in the Bullet Train Corridor Delhi-Ahmedabad that the National High Speed ​​Corporation Limited (NHSRCL) plans to build.
The corridor, whose detailed project reports have been compiled, are still in the planning stage and tends to be formed only in the second half of this decade.
The travel time on the 886km route is expected to be under four hours, with a total of 15 considerations being considered.
REWARI is the only other station proposed in Haryana.
The proposed route comes from Dwarka Sector 21 in Delhi and crosses to Gurugram at Chauma.
Then walked along the Dwarka toll road to Ramprastha City (sector 37D) before turning right to harmonize with the Delhi-Jaipur railway line and cross the KMP toll road before joining Highway Delhi-Jaipur in Shahjahanpur Toll Plaza (Border Haryana-Rajasthan).
NHSRCL officials conduct consultations in the city on Friday for land for corridors.
A NHSCL official told TII, “We have chosen this alignment (along the railroad and highway) to ensure that land acquisition is minimal.
In such a mega project, the maximum time is spent on obtaining private property.
While the alignment is final, gets The land has not yet begun.
Friday’s consultation with private landowners in Gurugram and Rewari bear fruit and they all agreed to let their land be obtained for the construction of bullet trains, it might feel the benefits to be offered by this project after being ready.
“The official added,” We will need About three to four years to obtain land, utility shifts, get required permissions and nocs for various departments, permission to cut trees and some other things before we can start construction work on the ground.
After the work starts, we will need about three years to complete the project.
“Besides DW Arka and two Haryana stopped, from the 15 stations proposed in the corridor, nine were in Rajasthan and three in Gujarat.
Officials said the corridor would be fully high.
At present, it takes around 14 hours by train from Delhi to Ahmedabad.
On the bullet train, it is expected to be under four hours.
15 stations have been proposed in Dwarka (Delhi), Imt Manesar (Gurugram), Rewari, Behror, Shahpura, Jaipur, Ajmer, Vijaynagar, Bhilwara, Chittorgarh, Udaipur, Dungarpur (All Rajasthan) and Himmatnagar, Gijarat (Gujarat).
Groundwork for other high-speed rail corridors – Delhi-Gurugram-Alwar RRTS (regional highway transit system) has been going on in the region.
“Delhi and Haryana The government has agreed to this project and the last nod awaited from the center.
Preliminary work such as land testing, widening of the road has begun and we are waiting for approval from the Ministry of Housing and urban affairs,” said an official.

About the author

news2in