Ayodhya Complete Ram Temple Foundation – News2IN
Lucknow

Ayodhya Complete Ram Temple Foundation

Ayodhya: With the launch of the 48 compact concrete layer, raising the temple foundation to a height above sea level, the fortified RamjanMabhoomi building was exhibited for the first time on Thursday by the toughness of the temple, which stated the first construction phase settlement.
The belief official confirmed that with a strong foundation in his place, Sanctum Sanctum Sanctorum RAM would be thrown into pilgrims in December 2023, only a few months before the Lok Sabha poll.
Apart from the design that hung fire for several months after the first pillar rocked in loose sand and streaming Saryhu underground, the brain of the best Indian technology hammered out of the last blueprint foundation, which took more than a year to be launched after PM Narendra Modi did ‘ Boomipujan ‘on August 5 last year.
On Thursday, Temple Trust invited journalists to RamjanMabhoomi premise for the first time to glance the extensive 2.77acre foundation, which length 50 feet, 400 feet length and 300 feet wide.
It was raised with the concrete roller compacted from stone ash, stone powder and cement with each layer of 12-inch thickness.
Temple Trust Member, Anil Mishra, said, after completing the first phase, the work will begin to establish a 1.5 m high raft, which will be thrown in cement, followed by the base that must be obeyed from Mirzapur.
Temple Temple Trust Champat Rai said, cubic feet 4lakh pink stone from Mirzapur will be used to build a base and 1 cubic feet of carmer marble from Bansi Paharpur in Rajasthan ready to sculpt the tower.
Experts are brainstorming on the construction of the outer edge wall around the main temple complex, given the security aspects.

About the author

news2in