Bengaluru: The sidewalk at St Marks Road, one of the first streets in the city to rebuilt and was excited at the cost of Rs 10 Crore under Tendersure six years ago, broken in several places.
Civil authorities have claimed that the tender road tends to survive at least for 10 years.
LSGO Jana Urban Space Foundation has tested the implementation of the tender road in Bengaluru.
The design imagines reclamation of pedestrian space, promoting sustainable transportation and integrating all utilities such as water, strength and OFC underground to prevent repeated excavations of Carriegeway.
Mishra’s teacher, who lives around him, said, “Footpath tiles have drowned a big risk of pedestrians.
If anyone stumbles and falls, he tends to be seriously injured.” “Vendors on the road and residents throw all kinds of mixtures into plants in the plant Along the sidewalk.
Maintenance of regular paths, plant beds and hanging flower baskets are very lacking, “Mishra accused.
The locals also pointed to tiles lost from several places and remaining debris along the sidewalk.
“It starts with the sidewalk in several places.
Now, the road has also been immersed in two places.
It can be dangerous for those who travel on two-wheeled vehicles and motorists,” said Karthik Manchik, another resident.
M Lokesh, the Head of the BBMP engineer, said: “There are plants as long as the sidewalk, which is the place where the seller is riding biodegradable waste.
It attracts mice, which then starts digging under the sidewalk that leads to the ground to be loose.
And, the sidewalk starts to sink.
After Identifying this problem, we have decided to use one layer of concrete in all our other projects.
“On repairing damaged sidewalks, Lokesh said,” For several years after the project was completed, the BBMP defended it.
The contract has now expired.
We have proposed a contract New and waiting for the same for approval.
People also tend to steal tiles.
“V Ravichandar, a Urbanist, said,” Many tender roads show signs of sinking and other problems in the first two years.
Is this problem have been handled at that stage , it will be resolved now.
Tendersure roads basically come with a five-year maintenance period, D I where the first time is a defective accountability period which means that whatever issues planted in this period must be repaired by the contractor concerned.
When the preliminary problem began to appear, BBMP might not show them to the contractor.
“
Ludhiana: The police have submitted FIR to four identified and at least 40 unknown attackers…
Sonīpat / Ludhiana / Ambala: Actor Punjabi - Activist Activist Deep Sidhu, who died in…
PATIALA / MANSA / BARNALA: Attacking Prime Minister Narendra Modi and AAP National Convener Kejriawal,…
Jalandhar: BJP and AAM AAM AADMI parties are one party, Secretary General of the Ajay…
Ludhiana: Minister of Union Culture Meenakshi Lekhi while campaigning to support the BJP candidate from…
Machhiwara (Ludhiana): AAM AAM AADMI Party (AAP) Head of Punjab Candidate and Members of Parliament…