Kolkata: A total of 32 police personnel – they were from Kolkata police, Bidhannagar Komisaries and civilian volunteers – had been deployed for human vehicle traffic and pedestrian movements in Chingrighata Crossing on Em Bypass – stretch 850M on the one hand from the BHYY captain to Buileghata to build more and 900m On the other hand, from the auto shelter’s stand on the canal road to the intersection of Sukanta Nagar.
The day after senior police officers, led by DGP acting Manoj Malviya, reviewed the traffic settings in Chingrighata Crossing after the guidance of the Chairperson of the Banerjee Mamata that death in this important stretch was no longer tolerated, the presence of police personnel was increased.
In addition, Kolkata police and Bidhannagar police have lined a series of plans to discipline motorists and pedestrians in place.
Back-to-back accidents at the chingrighata crossing on em bypass, some of them are fatal, leading to the traffic plan review there and cm direction to streamline the flow of vehicles.
As a direct step, the Kolkata traffic police have doubled the workforce in that place, increasing the number of personnel from 12 to 24.
“We used to only save six civil volunteers to overcome pedestrians.
Two sergeants were responsible for the flow of vehicles.
In addition, we maintained Police in Bidhannagar Cut and Chawlpatty Cut.
Now, we will use personnel at all from seven big and small cuts around Chingrighata.
We have introduced a knock on the police at Jalvayu Vihar and captain Bhery, “said an officer in Lalbazar.
The police have also decided to close the slip road near the metropolitan that crossed the bly-bied wing south of 9.30 in the afternoon, instead of 10 nights at the moment, until the end of winter.
“We increase the number of retro reflective marks that are seen through the fog.
We installed LED Blinkers on the road between Metropolitan and Chingrighata Crossings,” said an officer in Lalbazar.
Some long-term changes have also been proposed.
“The proposal, which comes from the former Commissioner Rajeev Kumar, has been revived.
Under it, Kolkata police will be asked to take over 550m, before the Chingrighata bridge on bypass to the intersection of the Bidhannagar police to allow smooth traffic monitoring.
Because this will be Requires a legislative nod, this is being discussed at the highest level, “said a Lalbazar officer.
Separate channels for other slow moving cycles and vehicles have also been proposed from the canal road to Nicco Park.
The police said that after working on the subway began, as proposed by experts from IIT-Kharagpur, they would use FOB as a pedestrian crossover.
“Once, it has finished installing the escalator on the upcoming and ready to use, no one is allowed to use the road to Cross and Jaywalkers will be fined heavily,” said a police officer.
Previously, to stop the accident on the side of the busted bypass, the traffic police had introduced two signals, in Maa Flyover and Avani Cut, close to the metropolitan.
The police are now seen to improve the signal cycle.