Categories: Mumbai

Collapse Bridge: Request ordered by MMRDA

Mumbai: Mumbai Metropolitan Regional Development Authority (MMRDA) has ordered an investigation of the collapse of the collapse of the construction of the construction in the Bandra-Kurla (BMC) complex on Friday morning.
Fourteen workers have magic escape after the range of bridge under-construction projects extension santacruz-chembur link (SCLR) collapses in the bandra-kurla (BKC) complex on Friday morning.
The bridge, where construction began in 2016, was conceived for the Dekongest CST Road, Vakola Junction, connecting LBS Road to Western Express Highway.
Metropolitan Srinivas Commissioner Srinivas said, “The three member committees, consisting of experts from the Indian Technology Institute (IIT) and Veer Jijamata Technological Institute (VJTI), will investigate and submit their reports in 15 days.” The request committee will look into the causes of collapse and recommend steps to prevent these incidents in the future.
He further said that the internal audit carried out by MMRDA through their staff and third parties will also be examined.
The Guardian Minister for the suburb of Mumbai Aaditya Thackeray Tweeted, “MMRDA has instituted a 15-day investigation and those responsible for negligence or other reasons for this part collapse, will not be spared.” In connection with the part of the collapse of the construction flyover, I have been related to @mmrdaofficial.

https://t.co/riiaovoukp- aaditya thackeray (@authackeray) 1631868029000Raha The collapse is made of steel.
It has a sharp curve-shaped design.
In April, the range was placed on the land of MMRDA near BKC-MTNL Junction, parallel to the Mithiriver path in the area.
Fortunately, there were no pedestrians under the portion that collapsed as MMRDA land, where the work was ongoing, really drawn.
The ranges of two lanes covering an area of ​​65 m and 8 m wide collapse weighs 250 mt.
1 / 5in pics: Flyover under construction collapses in Kurla Bandra Complex Previous Retionsan Bridge Results Construction collapses in the Bandra Kurla Mumbai Complex (BKC) early Friday – Sachin Harmar Fourteen people suffered a minor injury in the incident – anithe injury was taken to the hospital hotel – Sachin Haralkaraccording to the officials of fire department, the incident was reported at 4:40 a.m.
– Ani “Part of the path down construction that connects the main road BKC and Jalan Link Santacruz-chembur fainted around 4.30 in the morning.
13 people have suffered a minor injury and have shifted to Hospital.
There is no loss of life and no one is missing, said Manjunath Singe DCP (Zona 8) – Anisrinivas said, “Prima-Facie seems there may be some problems with bearings.” The bearings are set on two pillars opposite the above steel range .
Bearings take the burden of superstructure and bridge substructure.
The arm that collapses from DE Kat Citi Bank at BKC Road and turn left before taking the left turn again to take traffic from BKC to Santacruz.
Srinivas said, “The bridge is tilted when working on a concrete pouring on the surface of the slab.” Fourteen workers, who were taken to VN Desai Hospital had suffered a minor injury.
They will be paid compensation according to employment.
Mumbai: The lower portion of the flyover collapsed, 14 injuries of contractors for the bridge is the J Kumar Infra Limited project.
The work on the bridge has begun in 2016 and is scheduled to be completed in 2019.
However, the absence of road rights and design problems, as well as covid-19-induced locking, has caused a time limit extension.
The bridge, according to the revised schedule, is targeted to open in March 2022.
SCLR extension, which is 3.8 km long, is being built at Rs 415 Crore.

news2in

Share
Published by
news2in

Recent Posts

44 ordered to attack the procession

Ludhiana: The police have submitted FIR to four identified and at least 40 unknown attackers…

3 years ago

Punjab: Police Reject conspiracy theory in the case of Deep Sidhu

Sonīpat / Ludhiana / Ambala: Actor Punjabi - Activist Activist Deep Sidhu, who died in…

3 years ago

Punjab: Hidden Strength Working Behind PM Narendra Modi, Arvind Kejriwal, said Rahul Gandhi

PATIALA / MANSA / BARNALA: Attacking Prime Minister Narendra Modi and AAP National Convener Kejriawal,…

3 years ago

BJP made AAP to endanger the Congress, said Ajay

Jalandhar: BJP and AAM AAM AADMI parties are one party, Secretary General of the Ajay…

3 years ago

Our job is to make Punjab No. 1 State: Meenakshi Lekhi

Ludhiana: Minister of Union Culture Meenakshi Lekhi while campaigning to support the BJP candidate from…

3 years ago

Feb 20 is an opportunity to change the destiny of Punjab and his children: Bhagwant Mann

Machhiwara (Ludhiana): AAM AAM AADMI Party (AAP) Head of Punjab Candidate and Members of Parliament…

3 years ago