Mumbai: The day after Mumbai Mayor Kishori Pednekar asked BMC to fill the holes in 8-10 days, the commissioner of Iqbal Chahal City ordered officials to carry out the work to fill the footing for the next two-three weeks.
Chahal also issued new instructions to the engineers about how the hole would be filled.
“Since April 2021, BMC has filled more than 40,000 holes on all roads.
However, continuous rain for the past few days and increased traffic on the road has caused a resurrection of a hole.
Therefore, the process of filling the hole in the war.
The footing must begin together by all officials concerned at the environmental level and the road department.
The hole is reported to be filled in the same day if possible.
The work of filling holes must be carried out in 2 to 3 weeks in priority, “Chahal was booked on Tuesday.
Chahal holds meetings with officials for holes due to rain on the road and steps taken to overcome the diseases transmitted through water.
Chahal said that this year, Mumbai received around 3,000 mm of rainfall and continuous rain for the past few days.
Road traffic also increases after relaxing locking.
“However, without further ado, it is an administrative task to provide a good way by filling the hole,” said Chahal to officials.
Officials said that Chahal said that there were around 772 km of roads in Mumbai, around 147 km were road projects and about 625 km of roads were under the responsibility period (warranty).
“Actions need to be taken by related contractor / central agents to ensure that there will be no holes in these streets.
Apart from this, the assistant Commissioner City (ACS) from all wards must take action at the environmental level to fill holes on the long road 1,087 Km.
Road (res) engineer from all wards must personally visit each road in their respective regions and submit to assistant commissioners related within one day of information about the number of holes and the number of materials needed to fill it, “Chahal instructed it.
“AC must immediately report the cold mixture needed to the road department.
Cold mix and all the other required equipment must be supplied to all engineers immediately after receiving requests within 2 days.” As soon as the hole is recorded on the road, the charging process they must be completed in a day .
All ACS must visit the stem in each other every morning to ensure that filling the hole is done correctly.
Commissioner Joint / Deputy Commissioner All divisions must also continue to review the process of filling the hole.
In the department where other jobs / responsibilities have been assigned to res, they must be immediately released from their duty and only provide road maintenance responsibilities for the next month, “Chahal said.
Chahal said that the priority must also be given to fill the holes in The road shown by traffic police and solid roads, so it does not create traffic problems.
Holes must be filled at night if possible so that traffic will not be disturbed, said Chahal.