In 2023, ZIP from Airoli to Mumbra in less than 10 minutes – News2IN
Thane

In 2023, ZIP from Airoli to Mumbra in less than 10 minutes

Written by news2in

Thane: At the end of the year, traveling from Airoli to Mumbra Road can be cut to almost 10 minutes from one hour, because the important part of phase 1 of Airoli-Katai’s freeway construction is anticipated to be completed in December, Shiv Sena MP Dard Shinde Shinde announced.
DR Shinde Take a review of the project together with officials on Friday afternoon.
He then informed that the construction of the first twin tunnel of 1.8 km in The Airoli to Mumbra Lane was almost complete.
“The work occurred at a satisfying speed and about 500 m tunnel work on the remaining stretching, which will be finished And Shil Road, avoid the current circuit route, “said Dr.
Shinde.
The tunnel was mentioned as the longest to be built in urban Maharashtra.
-Manoj Badgeri.

About the author

news2in