Categories: India

Itbp spreads its own technical wings to build indo-china border roads, foot tracks

New Delhi: Indo-Tibetan Border Police (ITBP) has made the first decision to spread special technical wings to build certain roads and legs along the actual control line to accelerate the project connectivity with its posts in Ladakh and Arunachal Pradesh.
This step, which was approved by the UNI Ministry of Home, came in the midst of a military deadlock with China in the East Ladakh area.
Official sources told PTI that the border force, ITBP, had taken “challenges” to build four of the 32 roads under the Phase-II of the Indo-Chinese border road project and two out of a total of 18 18 feet transfers approved for the government.
They say the roads with long varied about one to two kilometers, connect the ITBP border post in the Himalayan range, are on the line of 3.488 km-length from the actual control (LAC) with China during the foot track, which is used by the troops during the patrol, located in the Arunachal Pradesh area.
The ITBP wing engineers and supervisors will “plan and monitor” all work, and land forces consisting of workers and masons will be employed according to government norms, said sources.
Traditionally, road construction projects along these fields were carried out by the Organization of Jalan Border (Bro), the Central Public Works Department (CPWD) and other institutions.
Officials said the style engineering wings, the important component of ITBP since increased in 1962, has been defeated for the task to accelerate the work of border connectivity.
In these high and remote areas, getting contractors and construction workers is not easy and therefore, the work of the construction of the border road remains slow, an officer explains.
The government has emphasized the need to ensure connectivity through roads so that rations, transportation and other logistics transportation along the LAC can be easily moved.
Therefore, this initial effort involved the ITBP technique wing was made, he said.
The ITBP technique wings, which are restructured for many years, are assigned to “take care of the construction of operational structures, including border posts, housing and office buildings, solar lighting, power units and water heating systems, improvised micro-hydel and green projects.
Homes In border areas that dress separate snow from designing strategic defenses around the border post.
“At present, the government has initiated the Phase-II Indo-China border project (ICBR) which includes several roads, foot tracks, and border posts.
The first phase of ICBR was launched in 2005 under the overall supervision of the Ministry of Home Affairs (MHA) and worked on a number of roads, Helipad and the forces of the forces of this period were underway.
According to official data, 538.50 kilometers of roads have been placed along the Chinese border until November last year.
The State Union Minister for Affairs of Nityanand Rai has recently said during the 60th day of MBP Raising on October 24 that the process of providing new border battalion sanctions for ITBP is in the “final stage”.
He referred to the last year of the central government sanctions from 47 new border posts and a dozen staging camps (operational bases for troops who conducted border patrols) to the paramilitary style trained by mountain war.
About 90,000 strong ITBPs were raised after the 1962 Chinese aggression.

news2in

Share
Published by
news2in

Recent Posts

44 ordered to attack the procession

Ludhiana: The police have submitted FIR to four identified and at least 40 unknown attackers…

3 years ago

Punjab: Police Reject conspiracy theory in the case of Deep Sidhu

Sonīpat / Ludhiana / Ambala: Actor Punjabi - Activist Activist Deep Sidhu, who died in…

3 years ago

Punjab: Hidden Strength Working Behind PM Narendra Modi, Arvind Kejriwal, said Rahul Gandhi

PATIALA / MANSA / BARNALA: Attacking Prime Minister Narendra Modi and AAP National Convener Kejriawal,…

3 years ago

BJP made AAP to endanger the Congress, said Ajay

Jalandhar: BJP and AAM AAM AADMI parties are one party, Secretary General of the Ajay…

3 years ago

Our job is to make Punjab No. 1 State: Meenakshi Lekhi

Ludhiana: Minister of Union Culture Meenakshi Lekhi while campaigning to support the BJP candidate from…

3 years ago

Feb 20 is an opportunity to change the destiny of Punjab and his children: Bhagwant Mann

Machhiwara (Ludhiana): AAM AAM AADMI Party (AAP) Head of Punjab Candidate and Members of Parliament…

3 years ago