Greater Noida: Upset of the work of “poor quality”, a number of locals from four Noida villages gathered in Peepalka Village and stopped road work which was less than 10 kilometers whose work began under Prime Minister Gramin Sadak Yojana.
Suspect that the quality of the leveling of the road was bad and started without cleaning the road placed two years ago, the locals Gherrao, a Junior PWD engineer and several other officials were present in place.
The problem is related to the road 10 kilometers between the road that is being built on the channel that runs among the Ghanghola Chowki police area and the village of Salempur Gurjar in Greater Noida, which passes Peepalka Village in Danka where the villagers from four villages arrived early Wednesday morning and got a job It stops.
Locals from Peepalka, Nawada, Salempur and Kanarsi alleged that the road that required improvements to be patchy, had collected dirt and PWD contractors who were suspected of doing “ugly” work by spreading the road with a thin layer of black concrete, without tarcol.
“The road patch was built in 2019 and it must be rebuilt.
The old patch becomes dirty with the rainfall factors and related weather.
However, the contractor only places a thin layer of black concrete without cleaning the patch below it and without using tarcol.
This results in a layer.
Come and the road beneath it is exposed, “Neeraj, former Pradhan from Nawada Village told TI.
The villagers of Gheroo, Junior Anil Kumar engineer and asked him to call Senior PWD officials.
Neeraj added that while the road width should be at least 20-25 mm, found only 10 mm.
Some call it “corruption.” “How many corruption will you do? It’s too much corruption,” alleged one of them.
On Thursday, Praveen Bhartiya, Corruption President Free India Outfit handed over a memorandum to HR (DADRI) on behalf of DM.
Speaking with Toi, Bhartiya said that two years returned too, the patch of road was built and it happened in a few months.
“In the past there were times when the PWD would build the road and it would not be released in 10 years, people would identify the road built by PWD and now, the situation was very different.
In this case, poor quality material is being used.
In 2019, villagers have been Planting granules on the road during the rainy season to symbolize poor quality from this road, “he said.
But PWD officials said that layering was carried out without cleaning the road which caused the same coming from several parts.
Chandraskhekhar Singh, Pwd Xen told Ti that the road had been under PMGSY this year and previously built under other projects.
“The workers have done layering without cleaning the patches that have been damaged due to bad weather and rain.
It should have been cleaned before layering.
It will be ascertained that layering is done again after cleaning the filling correctly so that it is not separated,” he said.
Ludhiana: The police have submitted FIR to four identified and at least 40 unknown attackers…
Sonīpat / Ludhiana / Ambala: Actor Punjabi - Activist Activist Deep Sidhu, who died in…
PATIALA / MANSA / BARNALA: Attacking Prime Minister Narendra Modi and AAP National Convener Kejriawal,…
Jalandhar: BJP and AAM AAM AADMI parties are one party, Secretary General of the Ajay…
Ludhiana: Minister of Union Culture Meenakshi Lekhi while campaigning to support the BJP candidate from…
Machhiwara (Ludhiana): AAM AAM AADMI Party (AAP) Head of Punjab Candidate and Members of Parliament…