Noida: Following the Lifting of the Prohibition by the Air Quality Management Commission (CAQM) on construction and demolition activities in NCR on Monday, the work of the Parthala Flyover near Sector 123 has been started from Tuesday.
While around 30% of the work at a height of six lines, 697 meters of flyover have been completed which includes the completion of the third foundation of the pillar, now the elevation work will begin including one pillar that must rise up to 38 meters due to the design of the flyover along with casting panels etc.
.
According to officials, the flyover that is being built at the cost of RS 81 Crore is expected to be ready in June next year.
“Even though we have permission to work at the Flyover Parthala where we have completed casting panel works that have been stored on the side, we have also completed the basic foundation including three pillars.
This number is around 30% of the work done.
Now with lifting prohibition on construction work By Caqm, we will begin to improve typical flying work.
For this, we have started working starting today.
This includes the height of one of the three pillars that will rise up to 38 meters as part of a distinctive design along with the height of two other pillars, ” The Mukesh Vaish Manager Manager said 6 Noida authorities.
Vaish added that in January-February, the substantial element of elevation work will be completed, and the structure will begin to appear.
“We hope to complete the flyover on June 202,” Vaish said.
Built at the cost of Rs 81 Crore on Master 3 (MP 3) Plan on the Parthala Roundabout near Sector 123, The Signature Flyover After Ready to bring assistance to thousands of commuters more than a dozen sectors including sector 51, 52, 61, 70, 71, 72 , 73, 74, 76, 76, 77, 78, 79, 121, 121, 122, 122, facilitating signal-free traffic from Delhi to Ghaziabad and lakh people living in Greater Noida Barat.
In accordance with the traffic survey carried out on stretching in 2018, an estimated 18,000 vehicles across the area within one hour during the peak time.
Key Points · Parthala Signature Flyover that will be ready in mid 2022 · The Six-Lane Flyover will run up to 697 meters in MP 3 Road on Parthala Roundabout · Project Costs RS 81 Crore · Expected to be ready June 2022 · Take advantage of a dozen sectors such as 51 , 52, 61, 70, 71, 72, 73, 74, 74, 77, 77, 74, 77, 121, 121, 122, 121, 121, 122, 121, 121, 122, 122 · Facilitating signal-free trips from Delhi to Ghaziabad and Greater Noida Barat · to facilitate lakh movement people who live in Greater Noida Barat too
Ludhiana: The police have submitted FIR to four identified and at least 40 unknown attackers…
Sonīpat / Ludhiana / Ambala: Actor Punjabi - Activist Activist Deep Sidhu, who died in…
PATIALA / MANSA / BARNALA: Attacking Prime Minister Narendra Modi and AAP National Convener Kejriawal,…
Jalandhar: BJP and AAM AAM AADMI parties are one party, Secretary General of the Ajay…
Ludhiana: Minister of Union Culture Meenakshi Lekhi while campaigning to support the BJP candidate from…
Machhiwara (Ludhiana): AAM AAM AADMI Party (AAP) Head of Punjab Candidate and Members of Parliament…