Rain sweeps the city road, leaving a hole plentiful – News2IN
Ludhiana

Rain sweeps the city road, leaving a hole plentiful

Written by news2in

Ludhiana: Commuter driving through city roads has difficulty because uneven holes and patches are made after water and heavy rainfall.
The situation is in such a way that in many areas, people complain that even the newly built road has been damaged, reflecting the quality of poor construction.
While in Dugri, a contractor left road construction work halfway after people complained about poor quality.
Before the imposition of the model of model behavior, MC and Ludhiana beliefs have built roads in many regions.
The population, even at that time, had made that the road not well built and the quality was compromised, but the complaint continued the deaf ear.
A shopkeeper in Dugri, Sukhbir Singh, said, “There was water logging throughout the road on Saturday, and many people could not judge the hole.
Someone went on the two-wheeled and his scooter was trapped in the crater.
The shopkeeper nearby helped him pull two wheels.
“He also claims that water has entered a scooter machine, and repairs will be expensive.
Meanwhile, a shopkeeper of the Town model, Arvind Sharma, questioned the quality of the poor road in the city model near Montgomery Chowk.
He said, “When the trust in repairing Ludhiana has built this road, I have warned officials about poor quality but they do not consider me seriously.
And now, after rainfall, the road is damaged.” He said such exercises led to the supply of public money .
“Similar is the situation on Pakhowal street where a road is built in low temperatures and works left between,” he added.
Kapil Arora, a resident of BRS Nagar, said, “The election time has come so people have to use their voices wisely to choose the right candidate.
Walk throughout the city in a sad condition, whether it was built recently or before.” He Adding that a bad city drainage system is also responsible for road damage.
When contacted, the Mayor of Balkar Sandhu said, “Because the electoral code, the new project will not be taken but officials have been told to get a long-repaired road.
In terms of road carpets that are just damaged, we will take action against the contractor.”

About the author

news2in