Thane: Four engineers from Thane Municipal Corporation (TMC) in Maharashtra on Saturday were placed under Penskorsan because of the dereltonya task for poor road conditions in the city, an official said.
The action had happened a day after the Minister of the Minister of GUARUL GUKEN EKNATH Shinde toured a streets full of Pothole in Thane and warned severe acts of officials responsible for poor road conditions.
Drachers Mounicherner Dr.
Vipin Sharma has suspended Junior Sandeep Gaikwad Engineer (Local-Savarkar Nagar Ward), Executive Engineer Prakash Khadtare (Vartak Nagar Ward), Deputy Engineer Sandeep Sawant (Local-Savarkar Nagar Ward) and Chetan Patel Executive Engineer (UTSAR WARD), said the official.
सततचा पाऊस व रस्त्यांच्या दुरवस्थेमुळे गेले 4-5 दिवस ठाणेकरांना वाहतूककोंडीचा सामना करावा लागत आहे.याची गंभीर दखल …
https://t.co/ubkljumosg- EKNATH Shinde – एकनाथ शिंदे (@MieKNathshinde) 16324932410001 / Photo 5in: MNS Workers protest Cracked in New Kopri Bridge In Thane Previous Nightshow Captionsmaharashtra Navnirman Sena (MNS) Thane City Chief Ravindra More along with party workers protested on Tuesday against cracks on the newly built Kopri bridge in Thane.
Photo of Toi: Anil Shindethe Project Expansion Widening Bridge Kopri to Stretch Eight Lines is below the execution by Mumbai Metropolitan Development Authority (MMRDA).
Photo of Toi: Anil Shinde A protest Donned ‘Apna Time Aayega’ T-shirts.
Toi Photo: Anil Shindethe Kopri Bridge, which connects Thane to Mumbai, built to make it easier for traffic to the city of Thane and other places.
Photo Toi: Anil Shinde can be remembered that the work on the bridge began three years ago and must be executed in two phases with the first in which two arms will be built on both sides of the existing range.
The Kopri bridge expansion project is run at a cost of Rs 250 Crore.
Toi Photo: Anil Shindethe Suspension orders are issued by the Supplementary City Commissioner TMC Sanjay Herwade, stated.
In the order, the engineers are responsible for the right maintenance of roads and examine the quality of repair work, which they have not done, produce a damaged road problem.
Although road repairs have been approved with the right budget, the work done is below the standard and these engineers do not monitor the same thing correctly, the order stated.