HYD: 15 projects worth RS 1.2k CR to make it easier for obstacles – News2IN
Hyderabad Uncategorized

HYD: 15 projects worth RS 1.2k CR to make it easier for obstacles

HYD: 15 projects worth RS 1.2k CR to make it easier for obstacles
Written by news2in

Hyderabad: By overseeing the city civil infrastructure with a leap and bound, The Greater Hyderabad Municipal Corporation (GHMC) has proposed many development projects throughout the city.
Among the projects that will be taken in stages, GHMC coordinates with South Central Railway (SCR) has proposed more than 15 projects worth 1,200 crore Rs.
These projects include new roads under the bridge (rubbing) and roads on the bridge (Robs) in several locations to find solutions to the problem of traffic continues to increase in the city.
Over time, the level intersection has become the main hassle given the increasing number of vehicles in the city.
At least 13 such projects are located in the northern part of the city, three in the south and two in the center of the city.
“The plan is to fully remove the junction of a manned level (MLC) within the GHMC limit.
Most of these projects have been going on in several parts of the city below the Strategic Road Development Plan (SRDP).
The state government has decided to coordinate with SCR officials and build projects This project, “said an GHMC official.
The location of the crossing line where Robs has been proposed including Mettuguda, Moula Ali, Ali’s face station, Maldajguda, Patigadda, Bollarum Station and Gundla Pochampally, Kakatiya Nagar, Vinayak Nagar, near Suchitra and Venkatapuram at Old Alwal, between Falaknuma and Budvel, and nearby Rajbhavan and Khairatabad.
This is separate, the Civic body has also set deadlines to complete at least 10 excessive feet (FOBs) in the city at the end of this year.
“After conducting a survey in places where this excess foot bridge is planned, it has been decided that about 10 feet of the bridge will be completed at the end of this year, while the 15-foot bridge will be completed next year,” said M Devanand, Chief Engineer GHMC (maintenance ).
Infinity Mall near Chandanagar, ESI Hospital in Erragadda, NSKK in Balanagar, Neredmet Crossroads, Central Mall in Panjagutta, GVK Mall in Banjara Hills, Swapna Theater in Katedhan, St Anns-Secunderabad, St Anns-Tarnaka and My Home Permata in Miyapur 10 The area where FOBS will be completed in the next two months at the end of December.

About the author

news2in