Adani Group Will Build the Longest E-Way for 17K Crore – News2IN
Business Uncategorized

Adani Group Will Build the Longest E-Way for 17K Crore

Adani Group Will Build the Longest E-Way for 17K Crore
Written by news2in

New Delhi: The Adani Group has pocketed a contract to build the longest highway project in India – RS 17,000 Crore and 594-km-Long Meergraj EWAY – above.
The Group will build 464 km from Budaun to Prayagraj consisting of 80% of this proposed toll road in three groups – 151.7 km from Budaun to Hardoi, 155.7 km from Hardoi to Unnao and 157 km from Unnao to Prayagraj.
Adani Enterprises Ltd will build three access groups controlled by six-free lanes, can be expanded to eight lines.
Read the Alsoganga Expressway: Everything you need to know After inaugurating the Purvanchal freeway and putting the foundation of the Jewar Airport Foundation, PM Narendra Modi will launch the Ambitious Ganges ExpressWaya project from Shahjahanpur on Saturday.
The move can lend fresh traction for the BJP development narrative ahead of Upael has received an award letter from the authority of the development of the Industrial Express API to implement the three main stretches in PPP mode on design, operation, and transfer with the concession period.
30 years.
Ganga Expressway connects Meerut with Prayagraj will be the longest toll road in India to be implemented based on DBFOT.

About the author

news2in