City’s smart Varanasi got a gift RS 325CR from PM – News2IN
Uncategorized Varanasi

City’s smart Varanasi got a gift RS 325CR from PM

Written by news2in

With Varanasi Info: City’s smart Varanasi receives a gift worth RS.
325.35 Crore from Prime Minister Narendra Modi, who inaugurated and laid the foundation of various other projects in Varanasi on Thursday.
According to a spokesman for Varanasi Smart City, Shakambhari Nandan Sonthalia, the talented PM of many projects, including the rebuilding of Beniabagh Park and the construction of basement parking, the construction of five wards, development, and beauty work of two ponds, and urban revitalization of roads and crossing of phase improvement 1.
Beniabagh Park has been rebuilt at a RS fee.
90.42 Crore in an area of ​​55,000 square meters, and includes facilities such as jogging tracks, pergola, lanes, food stalls, gazebos, open amphitheater air, garden reflexology, skating area, open gym, trampoline, fountains, drinking water and water Drink, and drinking water facilities such as toiletries, etc.
In addition, advanced basement parking has been built in an area of ​​15,500 sq.m., which has a capacity of 470 four wheels and 130 two wheels.
Apart from this, various signage, fire extinguishers, etc., has been provided in the parking lot.
A number of Rs.
65.53 Crore Invested at Distance Work Back in five old Kashi Regional Ward including Dashashwamedh (RS.
16.22 Crore), Kal Bhairav ​​(RS.
13.53 Crore), Rajmandir (RS.
13.53 Crore), and RS.
12.65 Crore) and Gadhwasi Tolia (9.60 Crore).
Dilapidated gutter and water can be replaced followed by the installation of traditional ‘chowka’ rocks on plain cement concrete (PCC).
Development and beauty of Nadesar Ponds and Sonbhadra are carried out at Rs costs.
4.40 crore.
Previously, this pool was in a dilapidated condition that had been rebuilt as a new site for residents and local tourists.
Open gym, jogging track, lane, gazebo, benches, offering and drinking water facilities have been provided on the edge of two pools.
Given the safety of locals, tourists and visitors in Varanasi, installation of more than 2,200 cameras in 720 places have been made at RS costs.
140 crore.
Advanced supervision cameras are equipped with facility such as facial recognition, introduction of automatic number plate, warning violations of speed, warning detection in the wrong way has been installed in the main area of ​​the city.
Along with this, Kashi integrated command and control centers in Sigra have also been expanded where modern view centers, data centers, etc., have been made.
RS funds.
25.00 Crore was spent on revitalizing the city and the crossing of phase-1 increase which included the main reconstruction work, Girjaghar-Godauliya-Maidagin and sonarpura-Bhelupur.
Info: 1.
Development of Beniabagh Park and Basement Parking Construction: RS.
90.42 CR 2.
Back Work of 5 Ward (Kal Bhairav, Dashashwamedh, Jangambari, Rajmandir, Tolia Ward Garhwasi): RS.
65.53 CR • Kal Bhairav ​​Ward: RS 13.53 CR • DashashWamedh Ward: RS 16.22 CR • Jangambari Ward: RS 12.65 CR • Raj Mandir Ward: 13.53 CR • Gadhwasi Tolia Ward: 9.60 Cr 3.
Development and Beauty Work Two Ponds: Nadarar Sonbhadra Pond: Rs 4.40 CR 4.
Installation of facial supervision cameras in 720 locations: Rs 140 CR 5.
Urban revitalization of roads and phase 1 increase in crossing: Rs 25.00 CR

About the author

news2in