Dusty road disturbing motorists, residents – News2IN
Hubballi Uncategorized

Dusty road disturbing motorists, residents

Written by news2in

Dharwad: Over the years, the train bridge near Tejaswi Nagar connects Dharwad with Kalghatgi Road, and the National Highway-4 bypass, has been in a sad country, placing tourists on gasoline.
However, the bridge is now being reconstructed, a lot to eliminate regular travelers.
The bridge is now closed for a month, and commuters must take a detour – while those who come to the Dharwad from the Belagiavi or Goa and take the Kalghatgi road will now be diverted to take the NH-4 bypass near Kelery, those who head to the bridge from Dharwad must travel Along Kalyan Nagar-Sriramnagar-Kalghatgi Road..Traveller from Dharwad can also use Gandhinagar-Someshwar Temple-Kalghirgi Road.
Unfortunately, the authorities concerned have not taken steps to strengthen the paths used while the bridge is closed for traffic to bear additional burdens.
Some roads whose traffic has now been transferred not asphalized, and heavy vehicle movements have kicked a lot of dust, adding to the frustration of commuting.
In addition to motorists, the cloud of dust floated here the road has left residents of Tejaswi Nagar, Girinagar, Gandhi Nagar, the layout of Siddarth and the University of HR engineering UPlum.
As a result, residents were forced to keep their windows closed for a better part of the day not to attack their homes.
Drivers and drivers are upset with the authorities because they fail to plan ahead, and do not check the road conditions before shifting forward.
traffic.
Giving himself to this dusty road has become a rather dangerous exercise for parents and children, confiscated by a cough attack inhaling dust.
As a result, many consider it safer to stay in their homes so that their health worsens.
Residents show that no official from Hubballi-Dharwad Municipal Corporation (HDMC) and selected representatives have visited the area to take stock situations, or listen to their complaints.
On these streets it is difficult to operate since dust often settles on their delicious, which results in customers worried about visiting the company.
HDMC officials, meanwhile, said that the bridge would be opened back into traffic within a week.

About the author

news2in