Kolkata: around 100m-150m from k k k k k k k kagore street with Rabindra Sarani and Kalakar Street will be closed from the end of this week to facilitate the demolition of the vivekananda street flyover.
This shutdown will effectively make vehicles from using Rabindra Sarii, and the transfer will increase the travel time both buses and small vehicles to North Kolkata, said an officer Lalbazar.
CP Joint (Traffic) Santosh Pandey took the stock of traffic flow from the part intended from Tagore Street KK after which the transfer plan was resolved.
“Effectively, Rabindra Sari will be outside the vehicle even though the road itself has not been closed.
This means longer diversion either through the Mullick Street or BK PAL Avenue ODULL,” said a senior traffic officer.
The transfer may be in place for a long time because KMDA was reported to look for six months to complete the work between Ganesh Talkies and Posta.
“The vehicle bound in the East at KKKK Paitore will be transferred to the north either through the ODULL Mullick Street or Strand Road.
The transferred traffic will take Nimtala Ghat Street to take advantage of CR Avenue or JM Avenue.
Nimtala Ghat Traffic which is bound in the East will also be transferred Together with BK Pal Avenue to the north to utilize Rabindra Sarani or JM Avenue.
Buses in Strand Road from Mirbahar Ghat Street will bring MG Road to the east to bring Rabindra Sarani or Cr Avenue.
Mini buses in Strand Road from Jalan Mirbahar Ghat will also bring MG Road To bring Rabindra Sarani / Cr Avenue, “said the notice signed by the Police Commissioner of Partner Soumen.
Jorabagan traffic guards say they are ready for diversion.
“We will deploy extra personnel at each intersection.
When stretching tends to be closed for a long time, we can change the transfer plan, based on land conditions,” said ACP.