Thane: Local train services for Kalwa, Mumbra, Copar and Thakurli commuters will remain not available for 36 hours starting Saturday afternoon when the central train will operate a block in the Thane-Kaly part to complete the important foot of the expansion of the Project Thane-Diva corridor.
Blocks will be operated on both slow lines from 2pm at 8.1.2022 (Saturday) and will expire at 2am at 10.1.2022 (Monday) .Officials say this is one of the biggest infrastructure blocks on the stretch and connect the track It was only placed between Thane and Kalwa with the existing slow corridor and other allied work was being carried out.
TNN.