Line Railway Missions are protected – News2IN
Coimbatore Uncategorized

Line Railway Missions are protected

Written by news2in

Coimbatore: South Railway Officials led by Train Safety Commissioner (CRS) Abhai Kumar Rai conducted an inspection of safety laws on the Railroad section of the country of 43 km between Podanur and Pollachi Junction on Monday, Commissioner checked electrical work, engineering, and signaling in parts.
High speed trials, with special train formations, held from Polylachi to Podanur train station.
Train specialized by electrical locomotives.
Car observations with modern equipment, to observe and record various aspects of electrification works, are part of a special train formation.
While the train has allocated Rs 159 Crore for Dindigul – Palakkad electrification work, RS 31 Crore is spent on podanur parts.
Because the part fell between Salem and the Palakkad train division, the train manager and division officials from the two divisions were present during the trial, in addition to senior officials from Chennai.
The train formation, attached to Loko Electricity, left at 3pm.
Arriving at Podanur 40 minutes later.
This section was given energy on September 1 and several trials were carried out by division staff before serving to be examined.
“CRS will submit a report and recommendation on Monday.
If everything goes well, the train service will begin soon in the section.
If he finds a deviation or space for a correction, it will be repaired, and CRS will do another inspection after corrective action is taken,” said a senior official.

About the author

news2in