Vadodara: Shastri Bridge Closed for 6 Months – News2IN
Vadodara

Vadodara: Shastri Bridge Closed for 6 Months

Vadodara: Shastri Bridge Closed for 6 Months
Written by news2in

Vadodara: The movement of vehicles from the Shastri Bridge to the train station will be limited for six months from Monday.
Police Commissioner on Saturday issued a notification in this case as Vadodara Municipal Corporation will move drainage lines, waterways, and stormwater drainage lines for bullet train projects.
Officials said that work will last for six months so as to avoid discomfort for commuting, the road will remain closed.
However, vehicle traffic from the train station to the Shastri Bridge will be permitted.
As an alternative, commuting must use Fatehgunj MAIN ROAD and IJIGUNJ to reach the train station.

About the author

news2in