Kolkata: Chingrighata Flyover set for short-term repairs – News2IN
Kolkata Uncategorized

Kolkata: Chingrighata Flyover set for short-term repairs

Kolkata: Chingrighata Flyover set for short-term repairs
Written by news2in

Kolkata: KMDA will try to temporarily extend the life of the Chingrighata Flyover to the new one, which has been proposed from bypass to a new city, built.
Agency has floated tenders for work with 1.2 crore RS costs.
The slide turns right which allows traffic from the city of science and metropolitan to turn to bypass Salt Lake without finding grumps or traffic from the opposite direction built almost two decades ago.
But the error line has developed in more than a decade, with experts who show loose on the deck.
The repair and repair work will try to strengthen the flyover load-bearing capacity.
In addition to attaching more steel plates, grouting work will be done.
Officials said there was no more load test needed because improvements would be carried out based on the results of the previous test.
Structural health assessment has diagnosed defects in its structural design.
After this, heavy vehicles are prohibited on the flyover.
Kmda currently doing repair work at Baghajatin Rail on the bridge while short-term repair work has just been completed in Setu Kaliganatat.

About the author

news2in