Kalaburagi: South Western Railway (SWR) will run two trains in the electrical locomotive as part of the electrification network path.
Thus, the train is No.
11312/11311 Hassan-Solapur-Hassan Daily Express has been running with an electric locomotive between Soapur-Yeshwantpur-Solapur on January 28 from Hassan.
The same train starts from Solapur having a return trip on January 29.
The train ran with an end-to-end diesel locomotive between Hassan and Solapur.
Likewise, Train No.
17307/17308 MySuru-Bagalkot-MySuru Basaga Express will run with an electric locomotive between MySuru and Yeshwantpur.
Basava Express will run 78% of routes with electric machines, and about 652km (from 826 km) between Yeshwantpur-Dharmavaram-Gunthkal-Raichuru-Wadi-Kalaburagi-Solapur.