Open sky, hell on the road as thick rainy eyelashes – News2IN
Chandigarh

Open sky, hell on the road as thick rainy eyelashes

Open sky, hell on the road as thick rainy eyelashes
Written by news2in

Chandigarh: City’s desire to rest from hot and moist conditions was abandoned and flooded on Monday.
If something worrying about people other than the dark prediction of the third covid wave is when will the monsun get speed? Finally, it leads to the rainfall of 18.6mm dropping a maximum temperature of almost 5 degrees from Sunday 32.5 degrees Celsius up to 27.7 degrees Celsius.
But relief comes at a price.
Waterlogging was reported in the Industrial Area, Phase I, Hallomajra, Darbar Ram, Bapu Dham Colony, Sector 28-29 Dividing Road, Sector 35 and several parts of Madhya Marg.
Many stretches in Madhya Marg, Purv Marg, Dakshin Marg and Sukhna lines are jammed by vehicles in the morning.
People —- many of them were soaked — finally reached their office late.
The UT government engineering department was forced to solve the small bridge in Patiala Ki Rao Choe because it led to the accumulation of water entering Khuda Lahora and Dhana housing area.
“Agricultural waste and other items blocking the bridge pipe.
As a result, water will accumulate leaving us without choice but to undermine the bridge,” said the source.
On the other hand, the authorities claimed the hasty roads cleaned in a quick time by mobilizing labor.
“Because we have cleared the sewers of the road since March, there are no major problems from the waterlogging reported, except for underpasses in the industrial area, phase I.
This is because dry leaves have blocked storm water pipes.
In almost all other areas, water is dried within 15 Up to 20 minutes, “claimed a MC technique wing official.
The fire wings and emergency services MC claimed that it only received a call to save the car trapped under water during working hours from the industrial area.

About the author

news2in